Building, renovating or doing up a home in Mumbai
Design IRL Editorial · Figures checked 9 November 2026 · For anyone building a house, renovating a flat or doing up a new flat in Mumbai · How we make our guides
In Mumbai most home projects are renovations of flats in housing societies, often in older buildings, squeezed between monsoons. Knowing which work needs BMC's permission, what your society asks for, and when to schedule waterproofing saves the most trouble.
Start here
- Renovating a flat you own: read "Renovating a flat in Mumbai" for what your society and the city need from you, then the costs below.
- Doing up a new flat: check the building's occupancy certificate (OC) before you take possession or start interiors.
- Building a house: your plans need approval before any work on site, filed by a registered architect.
Work out your own numbers
Describe your project in a sentence on Design IRL's "Where do I start?" page (for example "renovating a 1,200 sq ft flat in Mumbai, ₹15 lakh") to see what it should cost at Mumbai rates, the order to do things in, products within budget and firms to hire.
Renovating a flat in Mumbai
Under section 342 of the MMC Act, "tenantable repairs" need no proposal to BMC: plastering, painting, pointing, changing floor tiles, WC, bath, tap, sanitary and electrical repairs, and replacing a roof with the same material. In October 2025 the Bombay High Court confirmed that such repairs need no BMC permission.
Anything that changes the structure does need a BMC proposal: altering beams, columns or load-bearing walls, changing room dimensions, lowering floors, or adding a mezzanine or loft. Under the model bye-laws your society will also ask for the local authority's permission for structural changes and supervision by a structural engineer.
- Get your society's written NOC before work starts. Working hours, deposits, lift use and debris rules are set by each society, so ask for them in writing.
- Don't enclose balconies, flower beds or terraces into rooms. BMC treats them as violations of the sanctioned plan; residents have been booked under the MRTP Act for it.
- Debris: BMC's Debris on Call service collects household debris free up to 500 kg (book through the MyBMC app or BMC's helpline). Illegal dumping is fined ₹20,000 under the 2025 bye-laws.
- In July 2026 the Bombay High Court asked the state to frame rules on which flat alterations need permission, due by January 2027. Check whether they have been issued before you plan wall changes.
Doing up a new flat
Check that the building has its occupancy certificate (OC) before you take possession or start interiors; BMC issues OCs through its AutoDCR system, so the builder should be able to give you the OC number. In December 2025 MahaRERA held that "fit-out possession" without an OC is not valid possession, and buyers who refused it were not in default.
Building or rebuilding a house
In BMC limits, building proposals are filed online on AutoDCR by a registered architect or licensed surveyor; owners can't file directly. Approval runs in stages: the IOD, then the commencement certificate (CC) for the plinth and the rest of the building, then the occupancy or building completion certificate. Some areas inside the city, such as Bandra-Kurla Complex and Wadala, are planned by MMRDA instead.
Most Mumbai "new homes" are society redevelopments. A government resolution of 30 September 2026 replaced the 2019 rules: appointing a developer now needs written approval from at least 51% of all members.
What's different about Mumbai
- Monsoon: most of the year's 2,200–2,500 mm of rain falls between June and September. Finish waterproofing and exterior work before June.
- Old buildings: buildings over 30 years old need a structural audit under section 353B of the MMC Act. BMC publishes a list of dangerous (C1) buildings before each monsoon; 174 were listed in April 2026.
- Seismic zone III, under the 2016 code (a 2025 revision was withdrawn in March 2026).
- Water: BMC cut supply by 10% from May 2026, so plan wet work (curing, tiling) with your society's water in mind.
Costs and charges in Mumbai
| Charge | Rate | Note |
|---|---|---|
| Stamp duty, men | 6% | 5% plus 1% metro cess, in BMC limits |
| Stamp duty, women (sole name) | 5% | Sources differ on joint ownership; check the IGR Maharashtra fee page |
| Registration | 1% | Capped at ₹30,000 |
| Developer construction cost (Anarock, 2025) | ₹2,500–5,000+ per sq ft | Apartment projects by developers, not a home renovation quote |
We found no reliable published per-sq-ft figure for interiors in Mumbai. Use the renovation and interiors calculators at Mumbai rates, and get 2–3 quotes on the same drawings.
Who to hire in Mumbai
Firms listed on Design IRL in Mumbai, from their own websites. Verified pages and those showing their work come first; it isn't a ranking, and nobody pays to appear.
Interior designers
All 63 interior designers in MumbaiAtelier Design N Domain
Mumbai, India
Website
adnd.in
Canvas Kitchens
Mumbai, India
Website
canvaskitchens.com
Kunal & Associates
Mumbai, India
Website
kunalinteriors.com
Ministry Of Interior Design
Mumbai, India
Founders
Piyush Pahuja, Keval Gala
Architecture firms
All 42 architecture firms in MumbaiAtelier LateriteVerified
Mumbai, India
Quiet buildings from local earth and stone.
Founders
Meera Khanolkar, Arjun Desai
Architecture BRIO
Mumbai, India
Website
architecturebrio.com
Atelier Design N Domain
Mumbai, India
Website
adnd.in
Ecofirst Services Limited
Mumbai, India
Principals
Sachin Mishra
Contractors
All 30 contractors in MumbaiArchitecture Design Combine
Mumbai, India
Website
adcstudio.co
Blurring Boundaries
Mumbai, India
Principals
Shriya Parasrampuria, Prashant Dupare
JSH ARCHITECTS AND DESIGNERS
Mumbai, India
Founders
Jaswinder Singh Hanspal
Purple Patch Studio
Mumbai, India
Website
purplepatchstudio.com
Find the people
Sources
Most published cost figures come from firms that sell the work. We give ranges and you should get 2–3 quotes.
- BMC AutoDCR FAQ (approvals, s.342 repairs)
- Square Feat India: Bombay HC on tenantable repairs, Oct 2025
- Maharashtra model bye-laws: maintenance of flats
- LiveLaw: Bombay HC on flat alteration guidelines, Jul 2026
- Free Press Journal: Kurla flat alterations booked under MRTP Act
- Free Press Journal: BMC Debris on Call
- Free Press Journal: BMC's 2025 bye-law fines
- Square Feat India: MahaRERA on fit-out possession, Dec 2025
- IndiaLaw: Maharashtra redevelopment GR, Sept 2026
- Free Press Journal: dangerous buildings and water cut, Apr 2026
- Vision IAS: 2025 seismic map withdrawn, Mar 2026
- ClearTax: stamp duty and registration in Maharashtra
- IGR Maharashtra: fee structure
- Storyboard18: construction costs (Anarock), 2025