House construction cost

What it costs to build a house on your own plot: the building, approvals and fees, the extras you want, and how much money you'll need at each stage.

At the calculator’s starting settings, the total comes to about ₹63.8 lakh – ₹81.5 lakh in Mumbai and ₹42.4 lakh – ₹54.2 lakh in a typical tier-2 city. Change the settings below to fit your project.

Your project

About₹47.1 lakh ↓

Approximate cost

₹42.4 lakh – ₹54.2 lakh

Typically about ₹47.1 lakh

Approximate, from published rates, checked Nov 2026. Get 2–3 quotes before you commit.

All-in, per sq ft
₹2,357 per sq ft
Time, design to handover
13 months
Building rate used
₹2,000 per sq ft

Where the money goes

  • Building (₹2,000/sq ft, standard)

    Structure, walls, flooring, paint, doors and windows, basic wiring and plumbing

    ₹40 lakh₹36 lakh – ₹46 lakh

  • Approvals and soil test

    Building-plan sanction and fees; varies a lot by authority

    ₹45,000₹40,500 – ₹51,750

  • Architect and structural engineer (6%)

    Council of Architecture guideline for a house: 7.5%. Market: about 4–12%.

    ₹2.4 lakh₹2.16 lakh – ₹2.76 lakh

  • Contingency (10%)

    For surprises: hidden damage, price rises, changes of mind

    ₹4.29 lakh₹3.86 lakh – ₹4.93 lakh

Stage by stage

How much you'll need at each stage, and when. About 13 months in all.

  1. 1. Design, soil test and approvals

    ₹2.78 lakh · 3 months

    Survey, soil test, architectural and structural drawings, building-plan sanction

    Hire: architecture firmHire: structural engineer

  2. 2. Site preparation and digging

    ₹93,370 · 2 weeks

    Clearing, levelling, marking out, excavation, temporary power and water

    Hire: contractor

  3. 3. Foundation

    ₹4.2 lakh · 4 weeks

    PCC, footings and column stubs, with curing

    Hire: contractorHire: structural engineerCement & concreteSteel & metals

  4. 4. Plinth

    ₹1.87 lakh · 2 weeks

    Plinth beam, backfill, anti-termite treatment, damp-proof course

    Hire: contractorCement & concreteWaterproofing & adhesives

  5. 5. RCC frame and slabs

    ₹9.34 lakh · 2 months

    Columns, beams, slabs and stairs, about 3–4 weeks per slab

    Hire: contractorHire: structural engineerCement & concreteSteel & metals

  6. 6. Brickwork

    ₹3.73 lakh · 6 weeks

    Walls, lintels, sunshades, parapets

    Hire: contractorBricks & blocksCement & concrete

  7. 7. Plastering

    ₹2.33 lakh · 5 weeks

    Inside and outside

    Hire: contractorCement & concrete

  8. 8. Wiring and plumbing (concealed)

    ₹2.33 lakh · 5 weeks

    Conduits, boxes, concealed pipes and drainage, before plaster closes

    Hire: mep consultantHire: contractorWires & cablesPipes & plumbing

  9. 9. Waterproofing

    ₹93,370 · 2 weeks

    Bathrooms, sunken areas, a coated terrace, sump. A membrane or PU terrace costs more

    Hire: contractorWaterproofing & adhesives

  10. 10. Flooring and tiling

    ₹4.2 lakh · 4 weeks

    Floors, bathroom walls, skirting, stairs

    Hire: contractorTilesStone & marbleWood & vinyl flooring

  11. 11. Doors and windows

    ₹3.73 lakh · 3 weeks

    Frames, shutters, windows, grills

    Hire: contractorDoors & windowsHardware & locksGlass

  12. 12. Painting

    ₹2.33 lakh · 4 weeks

    Putty, primer and two coats inside; exterior paint

    Hire: contractorPaints & coatings

  13. 13. Bath and electrical fittings

    ₹2.8 lakh · 2 weeks

    Taps, sanitaryware, switches, distribution board, lights, fans

    Hire: contractorHire: lighting designerBath & sanitarywareSwitches & smart homeLightingFans

  14. 14. Compound wall, sump, septic and gate

    ₹2.8 lakh · 6 weeks

    Runs alongside the finishing work

    Hire: contractorHire: landscape architectBricks & blocksPipes & plumbing

  15. 15. Interiors

    ₹2.33 lakh · 2 months

    Kitchen, wardrobes and any interior work you've chosen

    Hire: interior design studioKitchens & wardrobesPlywood & boardsLaminates & veneersFurniture

  16. 16. Handover and completion certificate

    ₹46,685 · 4 weeks

    Snagging, cleaning, utility connections, completion / occupancy certificate

    Hire: architecture firm

Money needed by

Month 3

₹3.25 lakh

Month 6

₹18 lakh

Month 9

₹35.5 lakh

Month 12

₹46.7 lakh

Month 13

₹47.1 lakh

Who to talk to

Professionals listed in Jaipur: verified pages first, then alphabetical. Nobody pays to appear.

Architecture firms

Looking…

Structural engineers

Looking…

Contractors

Looking…

Good to know

  • Jaipur: Hot and arid; local stone is cheap.
  • Land isn't included. Rates assume a contractor who supplies materials and labour (turnkey), with GST in.
  • Get 2–3 quotes from contractors and compare like for like: the same brands, the same scope.

What it comes to, by city

Worked out by this calculator at its starting settings (listed below). A range for planning and comparing quotes, not a quote.

CityTotalTypical
Mumbai₹63.8 lakh – ₹81.5 lakh₹70.9 lakh
Delhi₹49.9 lakh – ₹63.7 lakh₹55.4 lakh
Bengaluru₹49.9 lakh – ₹63.7 lakh₹55.4 lakh
Pune₹47.8 lakh – ₹61 lakh₹53.1 lakh
Hyderabad₹44.6 lakh – ₹57 lakh₹49.6 lakh
Chennai₹50.9 lakh – ₹65.1 lakh₹56.6 lakh
A typical tier-2 city₹42.4 lakh – ₹54.2 lakh₹47.1 lakh

Starting settings

Part of Mumbai: Eastern suburbs · Built-up area: 2,000 sq ft · Floors: 2 · Finish level: Standard · Lift: No · Sump and borewell: No · Interiors: Not now

Common questions

How much does it cost to build a 2,000 sq ft house in India?

A 2,000 sq ft G+1 house with standard finishes comes to about ₹47–48 lakh in Jaipur and about ₹70 lakh in Mumbai, including architect and structural fees, approvals and a 10% contingency. Land, interiors, compound wall and borewell are excluded.

What is the house construction cost per sq ft in Indian cities?

Approximate turnkey rates for standard spec, land excluded, are ₹2,400–4,320 per sq ft in Mumbai, ₹1,800–2,700 in Delhi, ₹1,800–3,120 in Bengaluru, ₹1,900–3,000 in Chennai, ₹1,700–2,500 in Hyderabad, ₹1,700–2,700 in Pune, ₹1,850–2,400 in Jaipur and ₹1,800–2,200 in Lucknow.

What share of house construction cost is materials and labour?

Materials usually take about 50–60% of house construction cost and labour about 30–40%. Steel is the single largest material, at roughly a quarter of the material bill, followed by cement at about 16%.

What hidden costs come up when building a house?

Hidden costs often add 10–25% over the per-sq-ft rate. Typical ones are delays (about ₹50,000–2 lakh for every 2–3 months), development charges (₹50–150 per sq ft), waterproofing (₹30–60 per sq ft), anti-termite treatment (₹4–7 per sq ft) and temporary power and water (₹25,000–45,000).

More in the guide: House construction cost in India, stage by stage →

Read before you start

More in homes

How we work this out

Rules, not AI: your inputs times rates per city, gathered in November 2026 from builders, cement and paint brands, banks, interiors firms and government pages. Most published rates come from firms that sell this work, and they often disagree, so we show a range. Use it to plan and to compare quotes, not as a quote.