Join free

Plan & budget · Guides

Majboot ghar, bina seelan: how to build a damp-proof house (2026)

Design IRL Editorial · Reviewed by Ar. Shubham Kumar, Ar. Harsh Gupta and Ar. Vaishali Sharma · Expert review by Ram Lal, waterproofing contractor, Kanpur (34 years) · Figures checked 22 November 2026 · For families building their own house on a plot, and anyone buying a new flat · How we make our guides

A damp-proof house is decided before the walls go up. Treat the soil against termites and lay a damp-proof course at the plinth. Waterproof the sunken bathrooms before filling and the terrace once the slab has cured. Check each stage with a water test before it is covered, and set the waterproofing budget at the start, not from whatever is left.

“Ghar banvana hai, par majboot”

“Baarish mein seelan nahi chahiye”

“Ghar banvana to hai par majboot, baarish mein seelan nahi chahiye.” — Harsh Gupta, Prayagraj. (We do want to build a house, but a strong one. We don't want seelan in the rains.)

Seelan usually goes back to how the house was built: a plinth without a working damp-proof course, a terrace that doesn't drain, a bathroom tiled without a waterproof layer. All of these are cheap to get right during construction and expensive to fix later, once the floors and the interiors are done. In Design IRL's survey of 2,230 people, 1,465 worried about seelan or had already lived with it, and 120 of them had to redo their whole interiors.

“Waterproofing ka budget pehle hi plan kar lena chahiye”

“Clients ko pehle hi plan kar lena chahiye waterproofing ka budget.” — Ram Lal, waterproofing contractor, Kanpur, 34 years. (Clients should plan the waterproofing budget at the very start.)

Five places damp gets into a new house

Where to waterproof, in the order you build
  1. Foundation

    Soil and foundation

    Anti-termite treatment of the trenches and the plinth filling. In a basement or wet ground, waterproofing of the walls below ground, which can't be reached later.

  2. Plinth

    Damp-proof course

    A damp-proof course at plinth level, so ground moisture can't climb into the walls. Keep the plinth well above the road, which will rise over the years.

  3. Before filling

    Sunken bathrooms

    Waterproof the sunken slab and the walls up to at least a foot after the plumbing is fixed and pressure-tested, then ponding-test it before the filling and tiles.

  4. After the slab cures

    Terrace

    A screed laid to slope towards enough outlets, the parapet corners rounded and treated, then the waterproofing layer and a ponding test.

  5. Finishing

    Outer walls and openings

    Crack-free plaster, drip moulds over windows, sealed gaps around frames and pipes, and a waterproof exterior coat on the walls facing the rain.

Sequence from our construction stage guides and Dr. Fixit's list of areas to waterproof.

What the mistri most often gets wrong

  • A flat terrace, or too few outlets, so water stands after rain.
  • No proper joint between the terrace floor and the parapet wall, where many roof leaks start.
  • The sunken bathroom filled with rubble and tiled without waterproofing, or without a ponding test.
  • Pipes concealed in walls without a pressure test, so a leaking joint is found only when the wall gets damp.
  • The damp-proof course skipped or broken, or the plinth built too low.
  • Waterproofing work rushed into the monsoon, on a wet surface the coating can't bond to.

“Pehli baarish mein hi seelan start ho jaati hai”

“Pehle to client saste kaam karvata hai, contractors client ko pagal bana dete hain, aur pehli baarish ke season mein hi seelan start ho jaati hai, aur hamein bulaya jaata hai.” — Ram Lal, waterproofing contractor, Kanpur, 34 years. (First the client gets the cheap job done, contractors fool the client, the seelan starts in the very first monsoon, and then we get called.)

Check it yourself before it's covered

You don't need to be an engineer to check the most important stages. Be on site, or ask for photos and videos, at these points.

StageWhat to see
Foundation and plinthAnti-termite treatment being sprayed in the trenches and on the plinth filling, from sealed chemical containers; the damp-proof course laid along the full plinth.
PlumbingThe supply lines pressure-tested before walls are plastered and floors are filled.
BathroomThe waterproof coat on the sunken slab and up the walls, then a ponding test: water left standing, the ceiling below checked.
TerraceWater poured on the screed runs to the outlets; then the waterproofing layer, and a ponding test before anything is laid over it.
How long to leave water standing depends on the product; ask the contractor and check the product's data sheet.

What to budget

Our house calculator puts waterproofing at about 2% of the building cost. On a 2,000 sq ft house in Bengaluru at ₹2,350 per sq ft, that is about ₹94,000: enough for bathrooms, sunken areas, the sump and a coated terrace. A membrane or PU terrace needs more.

ItemApprox. ₹
Terrace, 1,000 sq ft, cementitious coat₹35,000–90,000
Terrace, 1,000 sq ft, 4 mm APP membrane₹1.2–1.6 lakh
One bathroom, about 50 sq ft of floorabout ₹8,000, more with full walls
Anti-termite treatment of the plinthabout ₹4–7 per sq ft of plinth area in most pest-control firms' listings
Before GST. Waterproofing from our waterproofing cost guide (Asian Paints, Houseyog); termite rates from pest-control firms' own listings, Nov 2026. In Lucknow, one contractor's published list starts at about ₹45 per sq ft for roofs and bathrooms.

Of everything in the house, this is the line not to cut. A coat skipped to save a few thousand rupees can cost a whole set of interiors later.

Deemak at the plinth

Termites come up from the soil, so the cheapest protection goes in at the very start: a chemical treatment of the foundation trenches, the plinth filling and the ground under the floor, done in stages by a pest-control firm. India's standard for it is IS 6313 (Part 2). Ask for the chemical's name, see the sealed containers, and get a written guarantee. Our deemak guide covers this in detail.

Buying a builder flat

  • At possession, walk the flat after rain if you can. Look at the ceilings, the walls next to bathrooms and the bottom of outside walls, and smell the wardrobes.
  • Run every tap and shower for a while, then check the walls and the ceiling of the flat below if you can.
  • Ask the builder what waterproofing was done in the bathrooms and on the terrace, by whom, and whether there is a warranty.
  • Under RERA, the builder must fix structural defects, or defects in workmanship, quality or services, that you report within five years of possession, within 30 days and at no charge. Put any seepage in writing.

Common questions

At which stages should waterproofing be done when building a house?

At the foundation and plinth (anti-termite treatment, a damp-proof course and, in wet ground or a basement, waterproofing below ground), in sunken bathrooms after the plumbing is tested and before filling, on the terrace once the slab has cured, and on outer walls and around openings at finishing. Check each stage with a water test before it is covered.

How much should I budget for waterproofing a new house?

Our house calculator puts waterproofing at about 2% of the building cost: about ₹94,000 on a 2,000 sq ft house in Bengaluru at ₹2,350 per sq ft. That covers bathrooms, sunken areas, the sump and a coated terrace. A membrane or PU terrace needs more.

What is a ponding test?

Block the drains or outlets, fill the bathroom floor or terrace with a little water, leave it for the time the product or contractor specifies, and check the ceiling below for damp before anything is covered.

Is the builder responsible for seepage in a new flat?

Under RERA, the builder must fix structural defects, or defects in workmanship, quality or services, that you report within five years of possession, within 30 days and at no charge. Put any seepage in writing.

Find the people

Related guides

Sources

Most published cost figures come from firms that sell the work. We give ranges and you should get 2–3 quotes.

  1. Design IRL: Mera Ghar Homeowners Survey (method and full results)
  2. Asian Paints: waterproofing cost in India
  3. Houseyog: waterproofing cost in India, March 2026
  4. Dr. Fixit: five areas of a home to waterproof
  5. BIS IS 6313 (Part 2): anti-termite measures in buildings, pre-constructional chemical treatment (2001 text)
  6. IndiaMART: termite pest control listings and rates (checked 22 Nov 2026)
  7. Real Estate (Regulation and Development) Act, 2016, section 14 (text hosted by Haryana RERA)

Your cart

Majboot ghar, bina seelan: how to build a damp-proof house (2026)