Design IRL Editorial · Figures checked 7 November 2026 · For anyone building or rebuilding a house and choosing an architect · How we make our guides

Most architects in India charge a share of the construction cost. The Council of Architecture's scale puts an individual house at 7.5%, but real fees run from about 4% to 12%. What matters as much as the number is what the fee covers.

How architects charge

There are three common ways. A percentage of the construction cost is the most usual for a house. A per sq ft fee is common for drawings only, with fewer site visits. A lump sum suits a small or very clear job, like an extension or a single floor.

The Council of Architecture (CoA) publishes Conditions of Engagement and a Scale of Charges. For an individual house it lists a minimum of 7.5% of the cost of works. For additions, alterations and retrofitting it is also 7.5%. Its own notes say fees on works up to ₹15 lakh may be negotiated.

In practice the fee is agreed between you and the architect. Small practices and tier-2 cities often quote lower. Well-known studios and complex designs quote higher.

Fee basisTypical rangeWhat you usually get
CoA scale, individual house7.5% of construction costFull service, concept to completion; interiors and landscape extra
Small practice, simple house4–6%Drawings, sanction set, a few site visits
Established practice, full service7.5–10%All stages, regular site visits, detail drawings
Design-led or complex house10–12% or moreCustom details, more options, closer supervision
Tier-2 cities, general practiceAbout 3–8%Varies widely; check the scope
Before 18% GST. Only the 7.5% is a published figure. The other ranges are our rate table's estimates.

What the fee covers, stage by stage

The CoA breaks full service into seven stages. Ask your architect which of these are in the fee.

  1. Concept design and a rough cost estimate.
  2. Preliminary design and a preliminary estimate, for your approval.
  3. Drawings for sanction by the local authority.
  4. Working drawings, specifications and a schedule of quantities for tender.
  5. Inviting and comparing contractors' quotes.
  6. Construction: detail drawings, samples, shop drawings and periodic site visits.
  7. Completion: as-built drawings and help with the completion or occupancy certificate.

Periodic site visits are not daily supervision. The CoA terms say day-to-day supervision is by a site supervisor or construction manager whom you appoint and pay. Budget for one.

Things often charged on top

The CoA scale adds documentation charges of 10% of the fee, plus travel for outstation visits. Revisions to approved drawings can be billed at 50% of that stage's fee. The CoA's full service includes structural and services design, but many architects quote without them, and the soil test is yours to pay for. Ask for all of this in writing.

When you pay

The CoA schedule ties payments to stages, not dates. Each figure below is the share of the total fee paid by the end of that stage.

StagePaid by then (cumulative)
On signing (retainer, adjusted at the end)5%
Concept design10%
Preliminary design20%
Drawings submitted for sanction30%
Sanction received35%
Working drawings and tender documents45%
Contractor appointed55%
Drawings to start work on site65%
Construction, in steps at 20%, 40%, 60% and 80% done70% to 85%
Virtual completion90%
Completion report and as-built drawings100%
From the CoA Conditions of Engagement. Your agreement can set a different split.

The fee itself is worked out on the real construction cost at the end, not counting land. Early stages are billed on the estimate, so expect an adjustment at handover. Our architect's fee calculator splits the payments on this schedule; if your agreement sets a different one, follow that.

A worked example

Say your house will cost ₹60 lakh to build, excluding land. At the CoA's 7.5%, the fee is ₹4,50,000. GST at 18% adds ₹81,000, so you pay ₹5,31,000.

  • Across the market range of 4–12%, the same house would cost ₹2,40,000 to ₹7,20,000 in fees, before GST.
  • If documentation charges of 10% are added, that is another ₹45,000 on a ₹4,50,000 fee.
  • By the time drawings go for sanction you would have paid about 30% of the fee, or ₹1,35,000 before GST.
  • A structural engineer is often about 0.5–1.5% of construction cost, or roughly ₹30,000–90,000 here. This is general practice, not a published rate: treat it as an estimate.

Our house calculator folds the architect and structural engineer together at about 5% for a basic house up to 11% for a luxury one.

How to save without regret

  • Don't cut the construction stage. Site visits catch mistakes that cost far more than the fee.
  • Freeze the brief early. Revisions after approval are where fees and delays grow.
  • If budget is tight, agree a design-only fee with a fixed number of site visits, and hire a good site supervisor.
  • Compare quotes on the same scope: number of site visits, 3D views, interiors, landscape and approvals.

Mistakes to avoid

  • Hiring without a written agreement listing stages, deliverables, site visits and payment steps.
  • Assuming the fee includes structural design, approvals liaison or interiors.
  • Paying by date rather than by finished stage.
  • Not checking the architect is registered with the Council of Architecture. You can search the register on its website.

Figures are approximate

Fees here are before 18% GST and vary by city, practice and design. Use them to plan, then compare written quotes.

Who to hire

An architect leads the design and the sanction drawings. A structural engineer designs the frame and foundations, often brought in by the architect. A contractor builds it. For anything beyond a simple house, ask the architect to name the structural engineer before you sign.

Find the people

Sources

Most published cost figures come from firms that sell the work. We give ranges and you should get 2–3 quotes.

  1. Council of Architecture: Conditions of Engagement and Scale of Charges
  2. Council of Architecture: professional documents
  3. Busy: GST on architectural services (SAC 998321)

Your cart

Pick for your space

We’ll fit Room of the day, your cart’s alternatives and your budget to it.

Project type

Location

When are you starting?
What help do you need?Pick any

Saved in this browser. Join free to keep it on every device.

Architect fees in India: percentage, per sq ft or lump sum